Tidy is not cosmetic.
A labelled, tested, documented cabling installation is the difference between a ten minute fix and half a day of tracing. Every run is terminated, tested to standard and labelled at both ends, and you get the results.
Cornwall throws up specific problems here: granite, cob, listed buildings, outbuildings across a yard, and sites where the last installer ran a single cable and hoped. Routes get planned around the building rather than forced through it.
- Cat6 and Cat6a horizontal runs
- Containment, trunking and discreet routing
- Patch panels, cabinets and cable management
- Labelling at both ends to a consistent scheme
- Fluke-standard link testing with results handed over
- Remedial work on existing installations
